● Service content: Settlement review
● Project Overview: Starting from the Shi'ao Line in the north and ending at Fanrong Street in the south, this section of the road is a main urban road with a total length of 4198 meters and a planned width of 50 meters. The total area of the road is 209900 square meters. The main construction contents include road engineering, bridge and culvert engineering, as well as supporting transportation engineering, water supply engineering, rainwater engineering, sewage engineering, lighting engineering, greening engineering, sponge city drainage system, etc.